County guides / Donegal
Donegal · county guide
Donegal's rules for one-off rural houses come from the County Donegal Development Plan 2024–2030 (As Varied, consolidated 6 Nov 2026 incl. Variation No. 1), which divides the county into 5 rural area types. It lists 5 local-need categories, and none of the area types in the extract is described as exempt from the local-need test. On occupancy, the extract says: An occupancy condition is attached to every grant, which may require a Section 47 agreement; the plan does not state a fixed term. Clachan houses (RH-P-5) are expressly without occupancy restriction.
01 · Area types
RH-P-1 · RH-O-2
Hinterlands of Letterkenny and Derry and around Donegal Town, Ballyshannon, Bundoran and Ballybofey/Stranorlar. Demonstrable economic or social need required, e.g. applicant, parent or grandparent resided in the area near the site for at least 7 years. No new holiday homes.
RH-P-2 · RH-O-2
Coastal areas with high holiday-home concentration. Same need test as urban-influence areas (7-year family residence or economic/social need). No new holiday homes.
RH-P-3
One-off houses considered from any applicant, subject to siting and design (RH-P-9). No new holiday homes.
RH-P-5 · RH-O-3
Permanent family homes without any rural housing need test and without occupancy restriction, subject to siting, road safety and public health.
RH-P-9 · RH-O-4 · Definition 4
Extremely limited capacity to absorb development; prominence in the landscape is a ground for refusal; low-wallstead refurbishments not favoured.
Map: Map 6.3.1 (Strong Urban Influence), Map 6.3.2 (Strong Holiday Home Influence), the clachan maps in 6.3.3, and Map 11.1 Scenic Amenity. Confirm the site against all of them.
02 · Local need
03 · Condition of permission
An occupancy condition is attached to every grant, which may require a Section 47 agreement; the plan does not state a fixed term. Clachan houses (RH-P-5) are expressly without occupancy restriction.
RH-P-9(c); RH-P-8(e)
04 · Development management
| Standard | What the plan says | Policy |
|---|---|---|
| Chapter 6 Housing — 6.3 Rural Housing; Objectives RH-O-1 to RH-O-6; Policies RH-P-1 to RH-P-12; Definitions | ||
| Site size | Not stated in Chapter 6; not yet read. | Development management standards |
| Ribbon development | In general 5 houses on any one side of 250 m of road frontage; assessed on area type and applicant, infill, extension or coalescence of ribbons, physical breaks, and whether a small cluster (including backland) would result. | RH-P-9(a)(ii); Definition 6 |
| Siting landscape | No suburban pattern, no prominence in the landscape, must blend with landform, trees and buildings; extensive excavation or infilling or tree removal not favoured. | RH-P-9(a); Rural Housing Location, Siting and Design Guide |
| Access | Access/egress must not be a hazard to road users or significantly scar the landscape; numeric sightlines in the development management standards. | RH-P-9(b)(iii) |
| Wastewater | Effluent and surface water disposal to EPA codes of practice; no risk to public health; River Basin District protected areas respected. | RH-P-9(b)(iv) |
| Natura views flood | No adverse impact on Natura 2000 sites, protected views or River Basin protected areas; flood risk policies apply. | RH-P-9(b)(i),(ii),(v); L-P-8 |
| Holiday homes | New one-off holiday homes are not permitted in any rural area type; holiday use only via re-use of existing stock or refurbishment of derelict traditional buildings (RH-P-6, RH-P-7). | RH-P-1, 2, 3, 5; Section 6.3.2 |
| Sewerage catchment | In the An Bun Beag – Doirí Beaga sewerage catchment, provision for future connection required. | RH-P-10 |
| Chapter 16 — Technical Standards (pp. 294–311: Roadside Boundaries in Rural Areas, Entrance Details, Visibility Splays at junctions/Site Entrances, Vision Lines, Building Setback on Non-National Roads, Stopping Sight Distance); Chapter 8 Infrastructure (T-P-12, WW-P-6) | ||
| Sightlines | Table 16.5 'Vision Lines at accesses to Non-National Rural Roads, outside 60kph speed limit zone' (DMRB TD 41-42/09 / DN-GEO-03043) — Multiple Access: 42 km/h Y 50 m; 50 km/h Y 70 m; 60 km/h Y 90 m; 70 km/h Y 120 m; 85 km/h Y 160 m; 100 km/h Y 215 m; X 3 m (stop sign at junction) to 9 m (yield sign). Single Access: X 2.4 m, Y per the speed limit above. Urban areas within 60 km/h: visibility 'shall be based on the stopping sight distances set out under Table 16.6' (DMURS). Table 16.7 stopping sight distances on non-national rural roads (DMRB TD 9/07): 100 km/h 215 m; 80 km/h 160 m; 70 km/h 120 m; 60 km/h 90 m; 50 km/h 70 m. National roads: TII standards incl. sight lines and stopping sight distances (T-P-12(c)(ii)). | Chapter 16 Table 16.5 / Table 16.6 / Table 16.7; T-P-12(c)(ii) |
| Entrance | 'Entrance details for residential properties shall be laid out in accordance with Table 16.1 and Figure 21.1' (cross-reference as printed; the figure is not reproduced in text). No residential gate set-back figure; 'For non-residential entrances the setback of entrance gates/barrier from road kerb shall be minimum of 20m.' Building setback from road centreline on non-national roads: 25 m regional, 15 m local; minimum setbacks from road centreline (Table 16.3): national primary 12.0 m, national secondary 10.0 m, regional 6.5 m, county road 5.0 m. | Chapter 16 Entrance Details / Table 16.3 / Building Setback on Non-National Roads |
| Wastewater | WW-P-6: single dwellings in unsewered areas facilitated with an independent treatment system that demonstrates compliance with the EPA Code of Practice for Domestic Waste Water Treatment Systems (PE ≤10) (EPA 2021), avoids over-concentration of systems and complies with WW-P-2 (no adverse effect on groundwater or drinking water). 8.2.5: the EPA Code sets the site assessment methodology including percolation values, setback distances and percolation-area sizing. WW-P-11: private wells/boreholes only where connection to public/group supply is not feasible, potable supply to EU Drinking Water standards and no adverse effect on water quality. No county-specific separation distances or minimum area. | WW-P-6 / 8.2.5 / WW-P-2 / WW-P-11 |
| Boundary | 'The line of existing roadside boundaries in rural areas should be retained, where possible, particularly along scenic roads, subject to traffic safety considerations, whereby setback may be required.' 'The setback area shall be soiled to a height no higher than 100mm above the level of the adjacent carriageway and shall be seeded with grass.' 'All roadside boundaries to be maintained by landowner to ensure vision line requirements are preserved (low Level Planting to ensure visibility).' | Chapter 16 Roadside Boundaries in Rural Areas / Vision Lines |
| National road access | T-P-12(a): no developments requiring new accesses, or adversely intensifying existing accesses, onto National Roads where the speed limit is above 60 km/h; T-P-12(b) N56 Five Points–Mountain Top preference order (alternative public road, then existing private access, then new access); T-P-14: new accesses to strategic roads to TII design standards; T-O-10: Spatial Planning and National Roads Guidelines (DECLG 2012). T-P-12 is subject to a Draft Ministerial Direction. | T-P-12 / T-P-14 / T-O-10 |
Design guide: Rural Housing Location, Siting and Design Guide (RH-P-9(a))
05 · Refusals
06 · Your site
The guide above is the policy. The report applies it to one site: which area type it falls in, every application nearby and how it went, flood, ground and designations, with every source linked.
07 · Source
Extracted from the adopted plan. Read verbatim from the consolidated as-varied plan PDF (plan pp. 80–94) via browser. Development management standards (site size, sightlines) in Chapter 11/appendices not yet read. Gaeltacht single-house language policy not in Chapter 6 (check Chapter 8 / settlement frameworks).