sitereport.ie

County guides / Tipperary

Tipperary · county guide

Building a one-off house in Tipperary: who qualifies and what gets refused

Tipperary's rules for one-off rural houses come from the Tipperary County Development Plan 2022–2028 (Volume 1, as varied by Variation No. 1, October 2026), which divides the county into 5 rural area types. It lists 5 local-need categories, and none of the area types in the extract is described as exempt from the local-need test. A grant carries a 7-year occupancy condition (Table 5.2 principle 2; Appendix 3 of the Development Management Standards).

01 · Area types

Where the rules differ

Policy 5-11 · Table 5.2 · Table 5.3

Areas under Urban Influence

Single houses facilitated on demonstrable economic or social need (Category 1A/1B or Category 2) plus siting, environmental and design criteria.

Policy 5-11

Primary Amenity Areas

Visually sensitive uplands and tourism areas (Glen of Aherlow, Galtees, Lough Derg lakelands). Same need categories as urban influence but social-need residence test is 5 km rather than 10 km.

Policy 5-11

Open Countryside

No economic/social need test. Applicant must never have owned a house in the open countryside, apply in own name, accept an occupancy condition, and show no alternative site is available within a settlement within 5 km.

Policy 5-13

Strategic Transport Corridors (national routes and strategic regional roads)

Generally unsuitable for new housing; exceptions only for economic need with no alternative site, or son/daughter of a qualifying farmer sharing the family entrance, or social need on land in family ownership 10+ years sharing the family entrance.

Policy 5-17

Town Environs (zoned)

Treated as rural for Policy 5-11; single house only on economic need with no alternative, or social need on land in immediate family ownership for 10+ years.

Map: Figure 5.3 of Volume 1 — Rural Areas with Strategic Transport Corridors and Primary Amenity Areas. Confirm the site's designation on it.

02 · Local need

Who qualifies

03 · Condition of permission

The occupancy condition

7 years
Table 5.2 principle 2; Appendix 3 of the Development Management Standards

Applicant must live in the dwelling for the first 7 years after construction. Applies in all rural area types including Open Countryside.

04 · Development management

Site standards the council will test

StandardWhat the plan saysPolicy
Chapter 5, Section 5.5 Residential Development in the Open Countryside; Section 5.6 Planning Policy 5-11 to 5-17
Site sizeNot stated in Volume 1; see Development Management Standards as Varied (not yet read).Volume 3 Development Management Standards
Ribbon developmentWhere 5 houses in total exist or are permitted within any continuous 250 m section of roadway, further development is resisted; an additional dwelling allowed only with economic or social need and no alternative, or on a gap site within a line of existing/permitted dwellings (one dwelling, fully occupying the gap).Policy 5-12
SightlinesSightline requirements set out in Volume 3 Appendix 6 (figures not yet extracted); Table 5.2 principle 4 requires the site to offer safe entry and exit.Volume 3, Appendix 6, Section 6.1 Road Design and Visibility at a Direct Access
AccessNew dwellings on Strategic Transport Corridors only under the three exceptions in Policy 5-13, each requiring a shared family entrance where practicable and no alternative site.Policy 5-13; Figure 5.3 / 12.2
WastewaterEPA Code of Practice — Wastewater Treatment Systems for Single Houses (2021) and the Development Management Standards on water quality and source protection apply.Table 5.2 principle 5
DesignTipperary Rural Housing Design Guidelines (Volume 3) apply to all applications.Table 5.2 principle 1; Volume 3 Rural Housing Design Guide
Volume 3 Appendix 6 Development Management Standards (2022 text; Variation No. 1 2026 amends only Appendix 6 Section 2.1 item 17 and Appendix 1 item 18)
SightlinesTable 6.1 X-Distance: National roads simple junctions stop control 2.4m; Regional & Local all junctions/accesses stop control 2.4m, yield control 3.0m; multiple residential/commercial 4.5m; Regional & Local accesses lightly trafficked (single residence) 2.0m. Table 6.2 (speed limit km/h / design speed / rural Y m / urban Y m): 30 / 40 / N/A / 33; 40 / 50 / 70 / 45; 50 / 60 / 90 / 59; 60 / 70 / 120 / 72; 80 / 85 / 160 / N/A; 100 / 100 / 215 / N/A. Y to an object height of 1.05m. National roads per TII DN-GEO-03060 (rural) / DMURS (urban).Appendix 6 Section 6.1, Tables 6.1 and 6.2
EntranceNo gate setback stated. New direct accesses not permitted within 90m of the exit of a roundabout on a national road (50m on non-national roads). Design Guide: gateways simple, timber or metal, 'restrained piers of stone or rendered block'.Appendix 6 Section 6.1; Appendix 4 Section 3.6
WastewaterReport by a qualified site assessor to the EPA Code of Practice for Domestic Wastewater Treatment Systems (EPA 2021) required with the application (Appendix 6 Section 4.3.1). Design Guide Section 2.8: well at least 10m from the septic tank or treatment system and 30-60m from the percolation area (depending on percolation rate).Appendix 6 Section 4.3.1; Appendix 4 Section 2.8
Boundary'Destruction of existing roadside boundaries should be avoided, except to the extent necessary to create a safe entrance'; new front boundaries restricted to simple materials common to the area.Appendix 4 Section 3.6

Design guide: Rural Housing Design Guide (Volume 3 Appendix 4, 'Tipperary County Council Design Manual for one-off houses')

05 · Refusals

Why applications here get refused

06 · Your site

Check a specific site

Free check · about 10 seconds

What does the planning record say about this site?

We read the site's location from the listing. County is only needed for a bare townland or coordinates.

Skip to the full report · €49

The full report for a site in Tipperary

The guide above is the policy. The report applies it to one site: which area type it falls in, every application nearby and how it went, flood, ground and designations, with every source linked.

Order the full report €49

07 · Source

Source

Plan
Tipperary County Development Plan 2022–2028 (Volume 1, as varied by Variation No. 1, October 2026)
Chapter
Chapter 5, Section 5.5 Residential Development in the Open Countryside; Section 5.6 Planning Policy 5-11 to 5-17
Link
https://www.tipperarycoco.ie/sites/default/files/2026-10/Written%20Statement%20as%20Varied.pdf
Standards
Volume 3 Appendix 6 Development Management Standards (2022 text; Variation No. 1 2026 amends only Appendix 6 Section 2.1 item 17 and Appendix 1 item 18)
Standards link
https://www.tipperarycoco.ie/sites/default/files/2022-09/Volume%203%20Development%20Management%20Standards.pdf
Extracted
2026-11-18
Not yet extracted
  • Minimum site size and numeric sightline distances (Volume 3 Development Management Standards as Varied, not read)
  • Figure 5.3 area designations are a map; site's designation must be read from it

Extracted from the adopted plan. Read verbatim from the adopted "Written Statement as Varied" PDF (pages 91–100) via browser; sightline and site-size standards live in Volume 3 Development Management Standards, not yet read.

Development management standards: confidence medium. Table 6.2 speed-limit to Y-distance mapping as read from text extraction - verify the row alignment against the PDF table; a consolidated 'as varied' Volume 3 PDF was not located on tipperarycoco.ie.